Burning smell, sparks, or a panel warm to the touch? Shut that circuit off at the breaker first. If there is smoke or flame, leave the house and call 911 before anything else.
EV charger installs
Level 2 charging, sized to your panel and your car — with the permit.

What the work covers
The install depends on what your panel can actually carry. We do the load calculation first, tell you honestly whether you need a panel upgrade or a load-management device, and install on a dedicated circuit with the permit and inspection that your utility rebate (and your home sale) will want to see.
- Load calculation before we quote
- Dedicated circuit, permitted and inspected
- Rebate paperwork you can actually submit
- Hardwired or NEMA 14-50
Worth knowing before the quote
These are the questions an electrician will ask. Having the answers ready makes the quote faster and more accurate — none of it asks you to open or touch anything.
- Which car, and whether it charges at 32A or 48A — it changes the circuit, not just the socket
- Where the car actually parks, and which wall that puts the unit on
- A photo of the panel with the door open, so the load calculation can start before anyone drives out
- Whether the utility offers a rebate locally, because the paperwork usually wants a permit number
Questions people ask about this
Do I need a panel upgrade for a charger?
Often not. A load calculation comes first, and load management can frequently make an existing service work — which is a far smaller bill than a new panel.
Hardwired or a plug?
Both are normal. A plug makes a future swap easy; hardwiring is required for some units and some locations. It is worth deciding before the wall is opened.